Space Industry and Business News  
Computer Glitch Delays Mars Phoenix Lander Work

illustration only
by Staff Writers
Washington (AFP) Jun 20, 2008
An information glitch aboard the Mars Phoenix lander has caused the loss of some non-essential images of the Red Planet and delayed the probe's work by 24 hours, NASA said Thursday.

"The spacecraft is healthy and fully commandable, but we are proceeding cautiously until we understand the root cause of this event," said Phoenix Project Manager Barry Goldstein of NASA's Jet Propulsion Laboratory (JPL) in Pasadena, California.

An unusually high volume of maintenance data on Tuesday left little room in the spacecraft's non-volatile flash memory, and the scientific data gathered that day was lost when the Phoenix powered down for the Martian night.

None of the lost data was high-priority information, JPL said, adding that it mainly consisted of images that can be retaken by the onboard camera.

To reduce stress on the flash memory capacity of the Phoenix, JPL late Tuesday sent instructions suspending all new scientific gathering activities on the Phoenix for Wednesday.

The Phoenix team said it expected scientific information gathering to resume on Thursday, but that instead of storing the data in the flash memory it would be downlinked to Earth on the same Martian day, or sol, it is collected.

"We can continue doing science that does not rely on non-volatile memory," Goldstein said.

Most of the scientific data gathered since the start of the Phoenix mission has been downlinked to Earth on the same sol, he added, without requiring overnight storage, except on some occasions when additional data is left for morning transmission, as was the case on Tuesday.

On Thursday, the Phoenix scientific team led by University of Arizona's Peter Smith plans to dig deeper in Martian soil with the probe's robotic arm, which looks like a back-hoe. They will also take more images and weather readings.

Before the computer glitch arose, the Phoenix had been digging into the soil around it uncovering a bright surface about 2-2.5 inches (5-6 centimeters) below the soil that has greatly intrigued scientists: some believe it could be ice, others a salt deposit.

Scientists hope the Phoenix will dig up more of this white material on Thursday for further analysis.

Samples of Martian soil analyzed so far have yielded no trace of water, the team said earlier this week.

Tuesday's was the third technical glitch in the Phoenix mission since it landed near the Martian North pole on May 25. The two previous ones involved two US satellites orbiting the Red Planet that relay information between the probe and Earth.

The three-month Phoenix mission is hoping to find evidence of the existence of water and life-supporting organic minerals in the polar region. It has been working for 22 sols -- the Martian day lasts 24 hours, 39 minutes and 35 seconds.

Source: Agence France-Presse

Related Links
Phoenix at LPL
Phoenix at JPL
Phoenix at NASA
Mars News and Information at MarsDaily.com
Lunar Dreams and more



Memory Foam Mattress Review
Newsletters :: SpaceDaily :: SpaceWar :: TerraDaily :: Energy Daily
XML Feeds :: Space News :: Earth News :: War News :: Solar Energy News


Phoenix Makes First Trench In Science Preserve
Tucson AZ (SPX) Jun 19, 2008
NASA's Phoenix Mars Lander began digging in an area called "Wonderland" early Tuesday, taking its first scoop of soil from a polygonal surface feature within the "national park" region that mission scientists have been preserving for science.







  • Lower costs drawing users to mobile Internet: industry
  • Ships Face Loss Of Broadband Cover
  • Analysis: Crackdown on domain name crooks
  • Pacific students lagging in computer age: researcher

  • Russia Launches Six Birds For Orbcomm
  • Russia Set To Launch Batch Of Orbcomm Birds Today
  • Russia Starts Equipment Delivery For Kourou Space Center On July 10
  • ProtoStar One Is Fueled For Its Launch From Kourou

  • DARPA Technology Enables Continued Flight In Spite Of Catastrophic Wing Damage
  • The Tu-144: The Future That Never Was
  • China's new jumbo-jet firm no threat to Airbus, Boeing: state media
  • China unveils new jumbo jet company: report

  • Raytheon Greatly Expands Available Bandwidth To The Military
  • Harris To Supply More Multiband Terminal For For US Navy Satellite Program
  • Launch Of British Military Satellite Makes It A Skynet Hat-Trick
  • SAIC Awarded Contract From DARPA To Support Deep Green Program

  • 'Spore' computer game aliens coming to virtual life
  • Space Radar To Improve Mining Safety
  • Integral Systems Integrated Solution To Support JCSAT-12
  • AF Engineers Create Thermal Control System For Space Use

  • Raytheon Names Catherine Blades VP Communications And Public Affairs Space And Airborne Systems
  • Globalstar AppointS Thomas Colby Chief Operating Officer
  • SES AMERICOM Announces Change In Executive Management
  • Bill Flynn Joins Americom Government Services to Lead Navy Programs

  • Satellite for tracking sea levels set for launch
  • Jason-1 Will Make It's 30,000th Orbit
  • NMSU Uses Information Collected In Space To Help Those On The Ground
  • Aster Images Sichuan Earthquake In China

  • Mio Tech Launches GPS Accessories, Map Updates And e-Store
  • Carnegie Mellon System Estimates Geographic Location Of Photos
  • u-blox Release Miniature NEO-5Q GPS Module For Mass-Market Apps
  • Clear Channel Radio's Total Traffic Network Expands Relationship With Mio Technology

  • The content herein, unless otherwise known to be public domain, are Copyright Space.TV Corporation. AFP and UPI Wire Stories are copyright Agence France-Presse and United Press International. ESA Portal Reports are copyright European Space Agency. All NASA sourced material is public domain. Additional copyrights may apply in whole or part to other bona fide parties. Advertising does not imply endorsement, agreement or approval of any opinions, statements or information provided by Space.TV Corp on any Web page published or hosted by Space.TV Corp. Privacy Statement