Space Industry and Business News  
US Congressional Subcommittee Examines The Status Of The ISS

NASA's out-year projections for ISS in the President's FY 09 budget request show minor funding level changes through 2013, which has caused the program significant challenges, including low levels of program reserves, uncertain status of the two "contingency" shuttle logistics flights, and low levels of research funding.
by Staff Writers
Washington DC (SPX) Apr 28, 2008
The House Science and Technology Committee's Subcommittee on Space and Aeronautics has held an oversight hearing to examine the status of the National Aeronautics and Space Administration's (NASA) International Space Station (ISS) program. Committee Members discussed the challenges facing the program and questioned witnesses regarding how it should be operated, managed, and utilized.

"While ISS has had a long, and at times controversial and frustrating development path, I am impressed with the progress that has been made in assembling and operating this incredibly complex international space-based science and technology facility," said Subcommittee Chairman Mark Udall (D-CO).

As the most complex international scientific and technological endeavor ever undertaken, ISS incorporates innovative ideas and technologies from the United States, Russia, Japan, Canada, and 10 member states of the European Space Agency. ISS has been continuously crewed for over six years. Once its assembly is completed it will have a pressurized volume of more than 33,000 cubic feet and a mass of more than 925,000 pounds.

The ISS is intended to support NASA's exploration initiative and to serve as a National Laboratory for space-based research. Currently, the Space Shuttle is scheduled for retirement in 2010, which will cause the U.S. to rely on partners such as Russia to provide routine transportation and emergency crew return from the ISS and to seek commercial resupply services.

"Although NASA talks about providing research opportunities on the ISS, we cannot forget that the funding cuts NASA has made to its microgravity research programs in recent years-whether willingly or not-have largely decimated that research community," stated Udall.

"I think the onus has to be on NASA to prove that it means what it says by taking meaningful steps both to make the ISS a productive venue for research and to start to rebuild that research community. Yet, it won't be possible to have a productive ISS unless the facility can be sustained after the Shuttle is retired."

NASA's FY 09 budget allocates $2.06 billon - an increase of $247 million from the FY 2008 appropriated amount - to the ISS program, which funds ISS operations and ISS Crew and Cargo Services.

NASA's out-year projections for ISS in the President's FY 09 budget request show minor funding level changes through 2013, which has caused the program significant challenges, including low levels of program reserves, uncertain status of the two "contingency" shuttle logistics flights, and low levels of research funding.

"It is no secret that we are currently living with the adverse impacts of the Administration's shortsighted decision four years ago to accept a four-year gap in U.S. crew launch capabilities after the Shuttle is retired. I hope we learn from that experience and not let the future of the ISS be determined by equally shortsighted measures," added Udall.

"Thus, if we are to realize a meaningful return on the nation's investment in the ISS, we need to ensure that the ISS's post-Shuttle logistics resupply needs are adequately funded. It is also clear that it is time for the Administration to commit to flying the two 'contingency' Shuttle flights that will deliver critical spares and logistics to the Station before the Shuttle is retired."

"Finally, we need to ensure that any decision on the service life of this international facility is based on sound policy considerations and thorough consultations with our international partners-and not simply be a date based on the current Administration's desire to make it conform to their own underfunded budget plan for NASA," noted Udall.

Related Links
House Science and Technology Committee
Station at NASA
Station and More at Roscosmos
S.P. Korolev RSC Energia
Watch NASA TV via Space.TV
Space Station News at Space-Travel.Com



Memory Foam Mattress Review
Newsletters :: SpaceDaily :: SpaceWar :: TerraDaily :: Energy Daily
XML Feeds :: Space News :: Earth News :: War News :: Solar Energy News


Expedition 16's Whitson Hands Over Command Of Station
Houston TX (SPX) Apr 18, 2008
Expedition 16 Commander Peggy Whitson officially handed over command of the International Space Station to Expedition 17 Commander Sergei Volkov. Thursday's ceremony took place inside the U.S. Harmony Node. The station crews have shifted their sleep schedules in preparation for Saturday morning's Soyuz TMA-11 undocking. Whitson and Flight Engineer Yuri Malenchenko will return to Earth with South Korean spaceflight participant So-yeon Yi.







  • Microsoft takeover deadline for Yahoo expires without comment
  • China world's largest Internet market
  • World's Fastest Satellite Internet Connection To User Terminal Via KIZUNA
  • Microsoft threatens proxy battle against Yahoo

  • AMOS-3 Communications Satellite Launched
  • PSLV Launches Ten Satellites
  • Arianespace plans bid to launch Galileo satellites: CEO
  • NASA Awards Launch Services Contract To SpaceX

  • Belgian airline says it will cut costs, emissions by slowing down
  • Airbus, Boeing sign accord to cut air traffic impact on environment
  • Oil spike, cost of planes led to Oasis collapse: founders
  • Airbus boss says aviation unfairly targeted over climate change

  • BAE To Develop Military Communications Network
  • 3rd SOPS Makes Historic WGS Transition
  • Lockheed Martin Opens Wireless Cyber Security Lab
  • Northrop Grumman Team Bids To Bring Order To Missile Defense

  • Boost For Green Plastics From Plants
  • Broken Heart Image The Last For NASA's Long-Lived Polar Mission
  • Expand Networks Improves Application Performance Over Satellite Communications
  • First Responders Educated On Importance Of Testing Satellite Phones

  • NASA names science directorate deputy
  • Northrop Grumman Names Terri Zinkiewicz VP Sector Controller For Its Space Technology Sector
  • Northrop Grumman Appoints Scott Winship To VP And Program Manager - Navy Unmanned Combat Air System
  • NASA Names John Shannon New Space Shuttle Manager

  • Successful Cooperation Extends Dragon Programme
  • NASA Web Tool Enhances Airborne Earth Science Mission
  • NASA Satellites Aid In Chesapeake Bay Recovery
  • India to blast satellite into space

  • First Interactive Location Aware Sports Application Is Launched At The 112th Boston Marathon
  • Backpacker Magazine Launches Fully Redesigned Website With GPS-Supported Content
  • GPS Devices And Systems Will Generate Revenues Of 240 Billion Dollars By 2013
  • Europe Moves Closer To GPS Independence With Latest Satellite Launch

  • The content herein, unless otherwise known to be public domain, are Copyright Space.TV Corporation. AFP and UPI Wire Stories are copyright Agence France-Presse and United Press International. ESA Portal Reports are copyright European Space Agency. All NASA sourced material is public domain. Additional copyrights may apply in whole or part to other bona fide parties. Advertising does not imply endorsement, agreement or approval of any opinions, statements or information provided by Space.TV Corp on any Web page published or hosted by Space.TV Corp. Privacy Statement