Space Industry and Business News  
Next Ariane 5 Takes Shape

Ariane 5's launch in early May will serve two long-time Arianespace customers: Intelsat (the operator of Galaxy 17) and SES (which will add Astra 1L to the satellite fleet of SES Astra).
by Staff Writers
Los Angeles CA (SPX) Mar 16, 2007
The Ariane 5 for Arianespace's upcoming dual-payload mission has completed its initial build-up as preparations continue for an early May launch with the Astra 1L and Galaxy 17 satellites.

The two large solid rocket boosters have been mated to Ariane 5's main core cryogenic stage, creating the propulsion system that will power the vehicle through its initial phases of flight.

This activity is taking place inside the Launcher Integration Building at Europe's Spaceport, where the Ariane 5 also will receive its ESC-A cryogenic upper stage and vehicle equipment bay.

Build-up of the launcher is being performed under the responsibility of Ariane 5 industrial prime contractor Astrium Space Transportation. Astrium will then transfer it to the Spaceport's Final Assembly Building, where Arianespace takes over for the payload integration, final checkout and launch.

Ariane 5's launch in early May will serve two long-time Arianespace customers: Intelsat (the operator of Galaxy 17) and SES (which will add Astra 1L to the satellite fleet of SES Astra).

This will be Arianespace's second flight of 2007, following the success of last Sunday's Ariane 5 mission that orbited the United Kingdom's Skynet 5A military communications satellite and India's INSAT 4B television/telecommunications relay spacecraft.

Arianespace is targeting six Ariane 5 flights in 2007 by Arianespace, and the company is building up to a stabilized rate of eight Ariane 5 missions annually by 2009.

Related Links
Arianespace
Launch Pad at Space-Travel.com
Launch Pad at Space-Travel.com



Memory Foam Mattress Review
Newsletters :: SpaceDaily :: SpaceWar :: TerraDaily :: Energy Daily
XML Feeds :: Space News :: Earth News :: War News :: Solar Energy News


First Ariane 5 Launch Of 2007 Finally Gets Away
Kourou, French Guiana (SPX) Mar 13, 2007
On 11 March 2007, an Ariane 5 ECA launcher lifted off from Europe's Spaceport in French Guiana on its mission to place two satellites into geostationary transfer orbits.







  • Publish, Perish Attitudes Make Profs Balk At Online Publication
  • World Getting Ready To Change The Light Bulb
  • Hong Kong Internet Access Fully Restored
  • New Damage And Bad Weather Delay Asian Internet Repairs

  • Next Ariane 5 Takes Shape
  • Official Opening Of The Soyuz Launch Base Construction Site In French Guiana
  • Canadian Satellite Given Final Checks At Russian Launch Pad
  • First Ariane 5 Launch Of 2007 Finally Gets Away

  • Germans Urged To Give Foreign Travel A Rest To Curb Global Warming
  • Raytheon Team Proposes Single International Standard In ADS-B Pursuit
  • NASA Signs Defense Department Agreement
  • Lockheed Martin And FAA Reach Significant Milestone In Transformation Of Flight Services

  • QinetiQ Completes Urgent Satellite Communications System Order For MOD Helicopters
  • Harris Gets Follow-On Production Contract For Military Tactical Communications System
  • US Army Developing Better Access To Intelligence Data Through Distributed Common Ground System
  • General Dynamics Completes Milestone In Design Of US Navy Mobile User Objective System

  • Saab Space To Supply Antennas For New Generation Direct-To-Mobile Satellites
  • Virtual Reality For Virtual Eternity
  • Boeing Orbital Express to Demonstrate New On-Orbit Servicing Capability
  • Top 10 Materials Moments In History Announced

  • Fifth Annual Space Career Fair Set For April 12
  • 30th Space Wing Welcomes New Commander
  • Joel Levine Named Mars Scout Program Scientist
  • Intelsat Names William Shernit President Of Intelsat General Subsidiary

  • Airborne Science In The Classroom The Next-Best Thing To Being There
  • A Cold-Water Monster Current Off Sydney
  • CryoSat-2 On The Road To Recovery
  • Climate Change View Clearer With New Oceans Satellite

  • Galileo Development Stalled Over Profitability Questions
  • New Receiver Board Gets All The Right Signals
  • Glonass Cheaper To Build Than GPS Says Putin
  • Raytheon To Pursue Air Force Upgrade For NextGen GPS Control Segment

  • The content herein, unless otherwise known to be public domain, are Copyright Space.TV Corporation. AFP and UPI Wire Stories are copyright Agence France-Presse and United Press International. ESA Portal Reports are copyright European Space Agency. All NASA sourced material is public domain. Additional copyrights may apply in whole or part to other bona fide parties. Advertising does not imply endorsement, agreement or approval of any opinions, statements or information provided by Space.TV Corp on any Web page published or hosted by Space.TV Corp. Privacy Statement