Space Industry and Business News  
ROCKET SCIENCE
NASA unsure next Moon rocket launch attempt possible this month
By Lucie AUBOURG
Kennedy Space Center, United States (AFP) Sept 4, 2022

After scrapping a second attempt to get its new 30-story lunar rocket off the ground due to a fuel leak, NASA officials said Saturday it may not be possible to try again this month.

The current launch window for NASA's Artemis 1 mission to the Moon ends Tuesday and is "definitely off the table," said Jim Free, associate administrator for Exploration Systems Development, at a press conference Saturday.

The next possible launch window is September 19 to October 4, and failing that, October 17 to 31, NASA said.

The ability to take off during those windows "will really depend on the options that the team comes back with likely on Monday or early Tuesday morning," said Free.

Millions around the globe tuned in to live coverage and crowds gathered on beaches in Florida on Saturday hoping to witness the historic blastoff of the Space Launch System (SLS).

But a leak near the base of the rocket was found as ultra-cold liquid hydrogen was being pumped in, forcing a halt.

The Artemis 1 space mission hopes to test the SLS as well as the unmanned Orion capsule that sits atop, in preparation for future Moon-bound journeys with humans aboard.

The first launch attempt on Monday had also been halted after engineers detected a fuel leak and a sensor showed that one of the rocket's four main engines was too hot.

"This is a whole new vehicle, a whole new technology, a whole new purpose of going back to the moon and preparation to go to Mars," said NASA administrator Bill Nelson. "Yes, it's hard."

Artemis mission manager Mike Sarafin described the hydrogen leak as "large," and said one of their "leading suspects" was a seal on a fueling tube.

Engineering teams believe they will have to replace the seal, either directly on the launch pad or after taking the rocket back to its assembly building a few miles away.

It was "too early" to entirely rule out a launch before the end of September, said Sarafin, who promised a status update next week.

NASA has previously said that the early October period would be complicated to coordinate because a crew of astronauts will be using the Kennedy Space Center for a rocket launch to the International Space Station.

In addition to the leak, another problem facing the SLS is its emergency self-destruct system.

Designed to explode in case the rocket deviates off course, the system will likely need to be reexamined before the next launch, which can only be done in the assembly building.

Bringing the rocket in and out of the building will take "several weeks," Sarafin said.

- Apollo's twin sister -

Once launched by SLS, the Orion capsule will take several days to reach the Moon, flying around 60 miles (100 kilometers) at its closest approach.

The capsule will fire its engines to get to a distant retrograde orbit (DRO) of 40,000 miles beyond the Moon, a record for a spacecraft rated to carry humans.

Mannequins equipped with sensors are standing in for astronauts on the Artemis 1 mission and will record acceleration, vibration and radiation levels.

The trip is expected to last around six weeks and one of its main objectives is to test the capsule's heat shield, which at 16 feet in diameter is the largest ever built.

On its return to Earth's atmosphere, the heat shield will have to withstand speeds of 25,000 miles per hour and a temperature of 5,000 degrees Fahrenheit (2,760 degrees Celsius) -- roughly half as hot as the Sun.

Artemis is named after the twin sister of the Greek god Apollo, after whom the first Moon missions were named.

Unlike the Apollo missions, which sent only white men to the Moon between 1969 and 1972, Artemis missions will see the first person of color and the first woman step foot on the lunar surface.

A successful Artemis 1 mission would come as a huge relief to the US space agency, after years of delays and cost overruns.

The cost of the Artemis program is estimated to reach $93 billion by 2025, with each of its first four missions clocking in at a whopping $4.1 billion per launch, according to a government audit.

The next mission, Artemis 2, will take astronauts to the Moon without landing on its surface.

The crew of Artemis 3 is to land on the Moon in 2025 at the earliest, with later missions envisaging a lunar space station and a sustainable presence on the lunar surface.

A crewed trip to the red planet aboard Orion, which would last several years, could be attempted by the end of the 2030s.


Related Links
Rocket Science News at Space-Travel.Com


Thanks for being here;
We need your help. The SpaceDaily news network continues to grow but revenues have never been harder to maintain.

With the rise of Ad Blockers, and Facebook - our traditional revenue sources via quality network advertising continues to decline. And unlike so many other news sites, we don't have a paywall - with those annoying usernames and passwords.

Our news coverage takes time and effort to publish 365 days a year.

If you find our news sites informative and useful then please consider becoming a regular supporter or for now make a one off contribution.
SpaceDaily Contributor
$5 Billed Once


credit card or paypal
SpaceDaily Monthly Supporter
$5 Billed Monthly


paypal only


ROCKET SCIENCE
Rocket Lab completes first test fire of reused Rutherford Engine
Long Beach CA (SPX) Sep 02, 2022
Rocket Lab USA, Inc (Nasdaq: RKLB) has successfully test fired a reused Rutherford first stage engine for the first time - a significant technical achievement in the Company's efforts to make its Electron launch vehicle the world's first reusable orbital small rocket. Rocket Lab conducted the full duration, full-thrust test fire of the refurbished Rutherford engine earlier this week at the Company's engine test facility. The engine was previously successfully launched to space and returned to Eart ... read more

Comment using your Disqus, Facebook, Google or Twitter login.



Share this article via these popular social media networks
del.icio.usdel.icio.us DiggDigg RedditReddit GoogleGoogle

ROCKET SCIENCE
Antenna enables advanced satellite communications testing

NASA awards LISA mission laser instrument contract

AFRL experiments with heat flow to manipulate quantum materials

Game on at Gamescom

ROCKET SCIENCE
ATLAS Space Operations secures $26M in Series B funding led by Mitsui

US Navy military sealift command awards Inmarsat 10-year wideband follow-on contract

Compact QKD system paves the way to cost-effective satellite-based quantum networks

Satellite operators Eutelsat, OneWeb agree to merge

ROCKET SCIENCE
ROCKET SCIENCE
Latest Galileo satellites join constellation with enhanced, faster fix

MariaDB reimagines how databases deliver geospatial capabilities with acquisition

Space Systems Command awards GPS support contract to Lockheed Martin

Safran acquires Orolia and plans to become the world leader in resilient PNT

ROCKET SCIENCE
Israel PM, standing next to F-35 jet, warns Iran of 'long arm'

Iran considers buying Sukhoi Su-35 jets from Russia

Air Force executes first in-flight next generation aircrew protection test in F-15E Strike Eagle

US Army grounds workhorse Chinook helicopter

ROCKET SCIENCE
MIT chemists develop a wireless electronic lateral flow assay test for biosensing

Semiconductor giant Micron to invest $15 bn in Idaho

A quantum pump without the crank

MIT team reports giant response of semiconductors to light

ROCKET SCIENCE
Space Compass and Skyloom sign term sheet to bring optical data relay services to EO market

Black Summer wildfires in Australia impacted climate and high altitude winds across the southern hemisphere

Chinese Gaofen satellites deployed for quake-hit Sichuan

Accenture invests in hyperspectral satellite company Pixxel to monitor Earth's health

ROCKET SCIENCE
Mercury pollution makes ducks more likely to get bird flu: study

Filtered ferry engines hailed for tackling air pollution

Study finds surge in illegal gold mining in Brazil

Heatwaves and wildfires to worsen air pollution: UN









The content herein, unless otherwise known to be public domain, are Copyright 1995-2024 - Space Media Network. All websites are published in Australia and are solely subject to Australian law and governed by Fair Use principals for news reporting and research purposes. AFP, UPI and IANS news wire stories are copyright Agence France-Presse, United Press International and Indo-Asia News Service. ESA news reports are copyright European Space Agency. All NASA sourced material is public domain. Additional copyrights may apply in whole or part to other bona fide parties. All articles labeled "by Staff Writers" include reports supplied to Space Media Network by industry news wires, PR agencies, corporate press officers and the like. Such articles are individually curated and edited by Space Media Network staff on the basis of the report's information value to our industry and professional readership. Advertising does not imply endorsement, agreement or approval of any opinions, statements or information provided by Space Media Network on any Web page published or hosted by Space Media Network. General Data Protection Regulation (GDPR) Statement Our advertisers use various cookies and the like to deliver the best ad banner available at one time. All network advertising suppliers have GDPR policies (Legitimate Interest) that conform with EU regulations for data collection. By using our websites you consent to cookie based advertising. If you do not agree with this then you must stop using the websites from May 25, 2018. Privacy Statement. Additional information can be found here at About Us.