Space Industry and Business News  
ESA Prepares ATV For ISS Docking

Shooting For A Par-3 Hole In Space. Click for large image chart of ATV docking process and proceeding tests.
by Staff Writers
Paris, France (ESA) Mar 22, 2008
Jules Verne ATV is lining up for Europe's first-ever automated docking in space. Following two demonstrations, the final 'putt' must be more accurate and gentle than on any rolling golf green.

Now that the vessel is 'on the green' - in a parking orbit 2000 m ahead of the ISS - ATV mission controllers must pace the spacecraft through two pending and crucial demonstration dockings, moving successively closer to the ISS, and then finally go for an actual rendezvous and docking attempt on 3 April.

ATV Control Centre: tight teamwork
Imagine the muscles, tendons, nerves and bones that must work in exquisite coordination and timing in a golfer's body to cause the ball to ultimately roll into the hole. It's the same with the ATV rendezvous and docking: A large number of people, computers, networks and systems must work in tight synchronisation - with fraction-of-a-second timing - to set Jules Verne on the last automatic leg of its docking.

The challenge is enormous and a successful first attempt will depend on very tight teamwork, excellent coordination and a superb understanding of the spacecraft and its complex automated control systems.

"The spacecraft is functioning perfectly, the team is very well trained and we are looking forward to an excellent first docking attempt on 3 April. It will be complex, but after our successful launch and early orbit phase, and the transfer to the parking orbit, the entire team here on the ground has gained a lot of confidence in themselves and in Jules Verne," says Alberto Novelli, ESA's Mission Director at the ATV Control Centre (ATV-CC) in Toulouse, France.

The ATV's automated Collision Avoidance Manoeuvre (CAM) capability was successfully tested in-flight on 14 March, and other functions of the sophisticated docking control system will be tested in two Demonstration Days, on 29 and 31 March.

The manoeuvres are planned using a series of way-points and station points in the vicinity of the ISS, indicated as S-1, S0, S1, S2 and so on, which map out a complex series of dynamic orbital trajectories and zones.

Note all times and dates subject to change.


Demonstration Day 1 - 29 March - 16:34 CET
The main purpose of Demo Day 1 is to test the ATV's Guidance & Navigation System; the test will be commanded from ATV-CC. This is expected to show that the ATV can perform relative navigation with the ISS using relative GPS (global positioning satellites) to successfully and safely manoeuvre ATV to station point S2, located 3500 m behind the ISS and at the same orbital altitude.

After Demo Day 1, the results will be assessed by the ESA JADOR (Jules Verne ATV Demonstration Objectives Report) team and submitted to the ISS Mission Management Team; after an assessment and authorisation on 30 March, ATV can proceed to Demo Day 2.

Demonstration Day 2 - 31 March - 14:40 CEST
The main purpose of Demo Day 2 is to test the Close Range Sensors and ATV's Guidance & Navigation System; the test will also include practising contingency procedures commanded by ATV-CC and by the ISS crew, as well as ATV close proximity manoeuvring.

ATV will be commanded to close to S4, 12 m from the docking port of Zvezda (the ISS Russian Service Module), then go back to S4, and finally an 'Escape' manoeuvre will be commanded to take ATV away from and around the ISS and back to station point S1.

Once ATV has been assessed as fully ready for docking, the first attempt is scheduled to be made for 3 April.

Docking - 3 April - 16:20 CEST
The docking procedure will begin at 13:44 CEST, with ATV starting from station point S3, 250 m from the ISS. The ATV computers will use use Videometer and Telegoniometer data for an automated final approach and docking. ATV will slow down to 7 cm/second as it closes to within a few metres of the Russian module.

ATV-CC mission controllers will direct the ATV in a step-by-step predefined approach, and will seek authorisation from the Russian Mission Control Centre in Moscow (MCC-M) before final contact.

At all stages, the ISS crew will be deeply involved. Their tasks will include control and monitoring of the ATV during Demo Day 1, 2 and docking, preparation of the Russian module for docking and issuing specific ATV commands, such as Abort, Hold, Retreat or Escape, when requested.

Related Links
Jules Verne ATV at ESA
Space Tourism, Space Transport and Space Exploration News



Memory Foam Mattress Review
Newsletters :: SpaceDaily :: SpaceWar :: TerraDaily :: Energy Daily
XML Feeds :: Space News :: Earth News :: War News :: Solar Energy News


Boomerang works in space: Japanese astronaut
Tokyo (AFP) March 21, 2008
In an unprecedented experiment, a Japanese astronaut has thrown a boomerang in space and confirmed it flies back much like on Earth.







  • Japan marks funeral for second-generation phones
  • Apple iPhone aiming to dethrone BlackBerry
  • Google stock price sinks on Internet ad-slump fears
  • HP And Qualcomm To Deliver Options For Worldwide Internet Access

  • Cape Canaveral Airmen Launch Delta II Rocket
  • ProStar GPS Guides Players At Arizona Golf Resort
  • Pratt And Whitney Rocketdyne Rocket Engine Powers Latest GPS Satellite Into Space
  • United Launch Alliance Launches Delta 2 For US Air Force GPS Replacement Satellite

  • Europe's EADS finds sweet home in Alabama despite uproar
  • A380 superjumbo makes European debut in London
  • Aviation industry must act fast on climate change: Airbus chief
  • Northrop, EADS to invest 600 mln dlrs in Alabama site

  • Northrop Grumman Ships First Beyond-Line-of-Sight IP Network To US Air Force E-8C Fleet
  • Northrop Grumman Delivers Payload Module For Second Advanced EHF Military Communications Satellite
  • Orbital Awarded Contract For System F6 Satellite Program By DARPA
  • Lockheed Martin Completes Rigorous Test Of First Advanced Military Communications Satellite

  • Russian-Launched US Satellite Unlikely To Reach Target Orbit
  • Artemis Provides Communications For Jules Verne ATV
  • New Discovery At Jupiter Could Help Protect Earth-Orbit Satellites
  • Quasicrystal Mystery Unraveled With Computer Simulation

  • NASA Names John Shannon New Space Shuttle Manager
  • Michael Larkin Appointed Executive Vice President Of Orbital's Satellite Business Unit
  • Boeing Integrated Defense Systems Looks To Future With Leadership Changes
  • Raytheon Space and Airborne Systems Names Carey VP For ISR Systems

  • Brazil, Germany To Develop Night-Vision Radar Satellite
  • NASA Goddard Delivers Aquarius Radiometer To JPL
  • New Portrait Of Earth Shows Land Cover As Never Before
  • Great Splitting Icebergs

  • XM Announces New 2009 Maxima To Offer XM NavTraffic
  • MapQuest And INRIX Collaborate To Deliver Traffic-Enabled Navigation Solutions
  • Ravenwood Golf Course Goes With ProLink For GPS Solutions
  • Starsem Readies Launch Of Second European Navigation Satellite

  • The content herein, unless otherwise known to be public domain, are Copyright Space.TV Corporation. AFP and UPI Wire Stories are copyright Agence France-Presse and United Press International. ESA Portal Reports are copyright European Space Agency. All NASA sourced material is public domain. Additional copyrights may apply in whole or part to other bona fide parties. Advertising does not imply endorsement, agreement or approval of any opinions, statements or information provided by Space.TV Corp on any Web page published or hosted by Space.TV Corp. Privacy Statement