Subscribe free to our newsletters via your
. Space Industry and Business News .




STATION NEWS
Crew Wraps Up Preparations for Wednesday's Spacewalk
by Staff Writers
Houston TX (SPX) Sep 05, 2012


Expedition 32 Flight Engineers Sunita Williams (right) and Akihiko Hoshide work with spacesuits aboard the International Space Station. Credit: NASA TV.

The Expedition 32 crew finalized preparations Tuesday for a second spacewalk in less than a week in the wake of an unsuccessful attempt to install a replacement power-switching unit on the International Space Station's truss Thursday.

Flight Engineers Suni Williams and Aki Hoshide, who spent the weekend studying revised procedures and fabricating an array of new tools, finished configuring the Quest airlock for a spacewalk beginning at 7:15 a.m. EDT Wednesday to complete the installation of a spare Main Bus Switching Unit (MBSU). The MBSU is a boxy, 220-pound component that relays power from the station's solar arrays to its systems.

A marathon 8-hour, 17-minute spacewalk Thursday - the third longest in history - ended with the spacewalkers unable to attach the switching unit into its housing on the truss.

Engineering teams at the Johnson Space Center in Houston have worked around the clock since Thursday to troubleshoot the problem that prevented the spare MBSU from being installed. The most probable cause is likely a combination of a slight misalignment in the positioning of the spare unit for its installation prior to bolting and possible damage to the threads of the receptacle posts on the S-zero truss to which the MBSU must be bolted in place.

Wednesday's spacewalk is scheduled to last 6.5 hours. If by the 4-hour mark the spacewalkers are still unable to install the MBSU, they will begin the process of cleaning it up and bringing it back inside the Quest airlock for further analysis and troubleshooting within the pressurized, shirt-sleeve environment of the station.

Flight Engineer Joe Acaba, who will lend a hand to the spacewalkers Wednesday from within the station via the Canadarm2 robotic arm, teamed up with Hoshide to review the robotics choreography. Later Acaba, Hoshide and Williams ran through the spacewalk procedures again and afterward participated in a conference call with spacewalk specialists on the ground for one final review.

Meanwhile, Commander Gennady Padalka and Flight Engineer Sergei Revin spent some time preparing for their departure from the station. Padalka, Revin and Acaba are scheduled to return to Earth Sept. 16 aboard their Soyuz TMA-04M spacecraft after four months in space, marking the end of Expedition 32 and the start of Expedition 33 under the command of Williams.

The crew was awakened before the normal scheduled wake time Tuesday when a cooling system valve for hardware in the Tranquility node failed. This has resulted in some equipment in Tranquility being powered down, but is unrelated to the MBSU issues.

In a coincidental but unrelated occurrence, a direct current power switching unit component that enables power to be routed at the proper amperage and voltage tripped late Saturday, causing one of the station array's power channels to default to a parallel channel.

Although the power trip is not linked to the station operating on only three of its four MBSUs at the moment, the station is currently operating on only five of its eight power channels. Even with three such channels unavailable, flight controllers have been able to reroute power to critical station systems and payloads with only a minimal impact on operations.

.


Related Links
Living and Working on the ISS
Station at NASA
Station and More at Roscosmos
S.P. Korolev RSC Energia
Watch NASA TV via Space.TV
Space Station News at Space-Travel.Com






Comment on this article via your Facebook, Yahoo, AOL, Hotmail login.

Share this article via these popular social media networks
del.icio.usdel.icio.us DiggDigg RedditReddit GoogleGoogle








STATION NEWS
Building MLM Under Way at Khrunichev
Moscow, Russia (SPX) Sep 04, 2012
The Khrunichev Space Center continue to build the flight version of the Multipurpose Laboratory Module (MLM) for the International Space Station. As of today, Khrunichev have mounted the ESA Robotic Arm, have laid down the onboard harness, have tested the thermal control system and the pneumatic/hydraulic systems, and are mating and tuning the solar panels. The MLM will be passed ove ... read more


STATION NEWS
Mobile gadget gamers take lead in US: NPD

Microsoft, Nokia step up arsenal in smartphone wars

UCF researchers record world record laser pulse

Miner Lynas gets Malaysia rare earths plant approval

STATION NEWS
Intelsat General Awarded Contract in US Government's New Custom SATCOM Solutions Program

Smartphone App Can Track Objects On the Battlefield as Well as On the Sports Field

Lockheed Martin Wins Role on Defense Information Systems Agency Program

Raytheon unveils cross domain strategy to securely access information via mobile devices

STATION NEWS
First-Stage Fuel Loaded; Launch Weather Forecast Improves

NASA launches mission to explore radiation belts

ISRO to score 100 with a cooperative mission Sep 9

NASA Administrator Announces New Commercial Crew And Cargo Milestones

STATION NEWS
Northrop Grumman to Supply Bridge Navigation Systems for Swire Group's Dry Cargo Ships

Mobile users wary of privacy invasion by apps: survey

CTrack Launches Lone Worker Device To Boost Protection And Peace Of Mind

Spirent Redefines Leadership in Location Testing with Solution for Hybrid Location Technology

STATION NEWS
'Sideways' aircraft for supersonic speed?

Chilean deal with EADS falling through

Arrest after China flight threat: state media

Airbus says Chinese-built planes to be sold only in China

STATION NEWS
More than 70 percent of electronic waste management is uncontrolled

Researchers measure photonic interactions at the atomic level

Wayne State's new flexible electronics technology may lead to new medical uses

Magnetic Vortex Reveals Key to Spintronic Speed Limit

STATION NEWS
Suomi NPP Captures Smoke Plume Images from Russian and African Fires

Remote Sensing Satellite Sends First Earth Imagery

Proba-2's espresso-cup microcamera snaps Hurricane Isaac

$3.7 Billion Reasons Why GIS Technology is The Future

STATION NEWS
Chemical use inflicts mounting bill on poor countries: UN

Philippine gold mine struggles to plug waste spill

Oil spilling from Turkish bulk carrier wreck off Cape Town

Wind concentrates pollutants with unexpected order in an urban environment




The content herein, unless otherwise known to be public domain, are Copyright 1995-2014 - Space Media Network. AFP, UPI and IANS news wire stories are copyright Agence France-Presse, United Press International and Indo-Asia News Service. ESA Portal Reports are copyright European Space Agency. All NASA sourced material is public domain. Additional copyrights may apply in whole or part to other bona fide parties. Advertising does not imply endorsement,agreement or approval of any opinions, statements or information provided by Space Media Network on any Web page published or hosted by Space Media Network. Privacy Statement