Space Industry and Business News  
Bonus Depreciation For Renewable Energy Projects Completed In 2008

The increased first-year depreciation may substantially improve the economic benefits available to an investor in a solar project.
by Staff Writers
Portland OR (SPX) Feb 15, 2008
Late last week Congress passed the Economic Stimulus Package of 2008 (the Act), which President Bush is expected to sign into law this week. Although the proposed extensions of the production tax credit (PTC) and investment-based energy credit were removed from the bill before it was passed, the final version of the Act does contain a bonus depreciation provision that could provide significant economic benefit for certain renewable energy projects that are acquired and placed in service in 2008.

To qualify for bonus depreciation, property that is part of a renewable energy project must satisfy the followng four criteria: (i) the property must have a recovery period of 20 years or less under normal tax depreciation rules, (ii) the original use of the property must commence with the taxpayer seeking to claim the deduction, (iii) the property generally must be acquired during 2008 and no written binding contract for the acquisition must have been in effect before 2008, and (iv) the property must be placed in service during 2008 (or, in certain limited cases, 2009).

If property meets these requirements, the owner is entitled to deduct 50 percent of the adjusted basis of the property in 2008. The remaining 50 percent of the adjusted basis of the property is depreciated over the ordinary tax depreciation schedule. Thus, for example, the portion of a wind project that qualifies for five-year MACRS depreciation may qualify for a total first-year depreciation deduction of 60 percent or 52.5 percent, depending on when during the year the facility is placed in service (50 percent bonus depreciation plus normal first-year depreciation for the remaining 50 percent of the adjusted tax basis).

This is similar to the bonus depreciation that was allowed for certain depreciable property that was placed in service following September 11, 2001 and in 2004 and 2005.

The bonus depreciation rules do not override the depreciation limitation applicable to projects qualifying for the energy-based investment credit (generally solar projects). Before calculating depreciation for such a project, including any bonus depreciation, the adjusted basis of the project must be reduced by one-half of the amount of the energy credit for which the project qualifies.

Nevertheless, the increased first-year depreciation may substantially improve the economic benefits available to an investor in a solar project.

Related Links
All About Solar Energy at SolarDaily.com



Memory Foam Mattress Review
Newsletters :: SpaceDaily :: SpaceWar :: TerraDaily :: Energy Daily
XML Feeds :: Space News :: Earth News :: War News :: Solar Energy News


New Erie Recreation Center Opens With Novan Solar System
Denver CO (SPX) Feb 15, 2008
Novan Solar has recently completed a 70-panel solar thermal system for the new Erie Recreation Center in Erie, Colorado. The heating system will generate nearly 9,200 therms (the equivalent of 275 MWh) of energy every year. This will provide a significant portion of the energy needed to heat a large aquatics area replete with a lap pool, leisure pool, whirlpool, water slide with splash tank, lazy river, and outdoor water sculpture and spray area.







  • HP And Qualcomm To Deliver Options For Worldwide Internet Access
  • Google's Android debuts in Barcelona
  • Nokia says to launch touch-screen phone in late '08
  • Lenovo pitching PCs to wider French market

  • ILS Proton Launches THOR 5 Satellite
  • Bigelow Aerospace And Lockheed Martin Converging On Terms For Launch Services
  • USAF Awards United Launch Alliance Three Delta IV Missions
  • Vandenberg Prepares For First Atlas V Launch

  • Military Aircraft To Perform Aviation Safety Research
  • Birds Bats And Insects Hold Secrets For Aerospace Engineers
  • Flapping-wing airplanes are envisioned
  • British-designed jet could reach Australia in under five hours

  • EADS DS Delivers Army Command And Control Information System To Franco-German Brigade
  • Thompson Files: Electronic war blindness
  • Harris Provides American Forces Network With Broadcast System To Reach One Million Troops
  • Raytheon Wins Air Force Satellite Communications Contract

  • Lockheed Martin-Built A2100 Satellite Fleet Achieves 200 Years In Orbit
  • Game consoles can model black holes, drug molecules
  • World's mobile phone industry heads for Barcelona
  • 3D pen 'feels' virtual organ images

  • Michael Larkin Appointed Executive Vice President Of Orbital's Satellite Business Unit
  • Boeing Integrated Defense Systems Looks To Future With Leadership Changes
  • Raytheon Space and Airborne Systems Names Carey VP For ISR Systems
  • NASA Selects Jaiwon Shin To Head Aeronautics Research

  • Indonesia To Develop New EO Satellite
  • Russia To Launch Space Project To Monitor The Arctic In 2010
  • New Radar Satellite Technique Sheds Light On Ocean Current Dynamics
  • SPACEHAB Subsidiary Wins NASA Orbiting Carbon Observatory Contract

  • GPS For The Prostate: System Keeps Radiation Therapy On Target
  • Graybar Delivery Advantage Program To Help Customers Better Manage Incoming Material
  • GPS spreading from cars to mobile phones
  • modu And Tele Atlas Join Forces To Combine Mobile Connectivity And Personal Nav Content

  • The content herein, unless otherwise known to be public domain, are Copyright Space.TV Corporation. AFP and UPI Wire Stories are copyright Agence France-Presse and United Press International. ESA Portal Reports are copyright European Space Agency. All NASA sourced material is public domain. Additional copyrights may apply in whole or part to other bona fide parties. Advertising does not imply endorsement, agreement or approval of any opinions, statements or information provided by Space.TV Corp on any Web page published or hosted by Space.TV Corp. Privacy Statement