Space Industry and Business News  
MARSDAILY
Assessing Perseverance's Seventh Sample Collection
by Louise Jandura | Chief Engineer for Sampling and Caching
Pasadena CA (JPL) Jan 10, 2022

This image of pebble-sized debris in the bit carousel on NASA's Perseverance Mars rover was acquired on Jan. 7, 2022, by the WATSON camera. The image was taken to assist the Perseverance team in diagnosing an anomaly that occurred during a rock sampling on Dec. 29, 2021.

On Wednesday, Dec. 29 (sol 306) Perseverance successfully cored and extracted a sample from a Mars rock. Data downlinked after the sampling indicates that coring of the rock the science team nicknamed Issole went smoothly. However, during the transfer of the bit that contains the sample into the rover's bit carousel (which stores bits and passes tubes to the tube processing hardware inside the rover), our sensors indicated an anomaly. The rover did as it was designed to do - halting the caching procedure and calling home for further instructions.

This is only the 6th time in human history a sample has been cored from a rock on a planet other than Earth, so when we see something anomalous going on, we take it slow. Here is what we know so far, and what we are doing about it.

The anomaly occurred during "Coring Bit Dropoff." It's when the drill bit, with its sample tube and just-cored sample nestled inside, is guided out of the percussive drill (at the end of the robotic arm) and into the bit carousel (which is located on the rover's chassis). During processing of previous cored rock samples, the coring bit travelled 5.15 inches (13.1 centimeters) before sensors began to record the kind of resistance (drag) expected at first contact with the carousel structure. However, this time around the sensor recorded higher resistance than usual at about 0.4 inches (1 centimeter) earlier than expected, and some much higher resistance than expected during the operation.

The team requested additional data and imagery to ensure proper understanding of the state post anomaly. Because we are presently operating through a set of "restricted Sols" in which the latency of the data restricts the type of activities we can perform on Mars, it has taken about a week to receive the additional diagnostic data needed to understand this anomaly.

Armed with that data set, we sent up a command to extract the drill bit and sample-filled tube from the bit carousel and undock the robotic arm from the bit carousel. During these activities, a series of hardware images were acquired.

The extraction took place yesterday (1/6) and data was downlinked early this morning. These most recent downlinked images confirm that inside the bit carousel there are a few pieces of pebble-sized debris. The team is confident that these are fragments of the cored rock that fell out of the sample tube at the time of Coring Bit Dropoff, and that they prevented the bit from seating completely in the bit carousel.

The designers of the bit carousel did take into consideration the ability to continue to successfully operate with debris. However, this is the first time we are doing a debris removal and we want to take whatever time is necessary to ensure these pebbles exit in a controlled and orderly fashion. We are going to continue to evaluate our data sets over the weekend.

This is not the first curve Mars has thrown at us - just the latest. One thing we've found is that when the engineering challenge is hundreds of millions of miles away (Mars is currently 215 million miles from Earth), it pays to take your time and be thorough. We are going to do that here. So that when we do hit the un-paved Martian road again, Perseverance sample collection is also ready to roll.


Related Links
Perseverance Mars 2020
Mars News and Information at MarsDaily.com
Lunar Dreams and more


Thanks for being here;
We need your help. The SpaceDaily news network continues to grow but revenues have never been harder to maintain.

With the rise of Ad Blockers, and Facebook - our traditional revenue sources via quality network advertising continues to decline. And unlike so many other news sites, we don't have a paywall - with those annoying usernames and passwords.

Our news coverage takes time and effort to publish 365 days a year.

If you find our news sites informative and useful then please consider becoming a regular supporter or for now make a one off contribution.
SpaceDaily Contributor
$5 Billed Once


credit card or paypal
SpaceDaily Monthly Supporter
$5 Billed Monthly


paypal only


MARSDAILY
Sol 3349: Ridges, Big and Small
Pasadena CA (JPL) Jan 07, 2022
Another successful drive on Mars resulted in a dusty bedrock workspace with nodules and small raised ridges in front of the rover. Curiosity also has a view towards larger scale, dark, resistant ridges that we have noticed within the more subdued and lighter coloured, more typical bedrock in this area. The science team decided to investigate the chemistry and texture of one of the small, raised ridges in the workspace ("El Fosso") with APXS and MAHLI. Is the ridge there because of the presence of ... read more

Comment using your Disqus, Facebook, Google or Twitter login.



Share this article via these popular social media networks
del.icio.usdel.icio.us DiggDigg RedditReddit GoogleGoogle

MARSDAILY
New AI navigation prevents crashes

A second successful launch for SpaceCloud into space

OMEGA joins ClearSpace to clean up space

NASA satellite servicing technologies licensed by Northrop Grumman

MARSDAILY
Teaming up to deliver a new Airborne ISR SATCOM capability for MilGov Operators

Intelsat buys 2 Software-Defined Satellites from Thales Alenia Space to boost 5G solution

SES Government Solutions Launches On-Demand X-band Service Platform

SPAINSAT NG program successfully passes Critical Design Review

MARSDAILY
MARSDAILY
Arianespace to launch eight new Galileo satellites

Two new satellites mark further enlargement of Galileo

Galileo satellites given green light for launch

Brain and coat from RUAG Space for Galileo navigation satellites

MARSDAILY
Greece takes delivery of Rafale jets from France

Zero CO2 emissions 'spaceplane' parts to be manufactured in the heart of Sydney

Philippines to buy 32 new Black Hawk helicopters

Hong Kong airport bans transit passengers from most of world

MARSDAILY
World's first hBN-based deep ultraviolet LED

Reasserting U.S. leadership in microelectronics

Semiconductor spin qubits gain further credibility as leading platform for quantum computing

Quantum computing in silicon hits 99% accuracy

MARSDAILY
Manufacturing revenues for Remote Sensing to reach $76B by 2030

Particles formed in boreal forests affect clouds in the troposphere

The secrets of ancient Japanese tombs revealed thanks to satellite images

Flying with the clouds

MARSDAILY
Environmental activist, 14, shot dead in Colombia

Microplastic pollution linger in rivers for years before entering oceans

Pakistan court orders golf course shut in rare ruling against military

Understanding air pollution from space









The content herein, unless otherwise known to be public domain, are Copyright 1995-2024 - Space Media Network. All websites are published in Australia and are solely subject to Australian law and governed by Fair Use principals for news reporting and research purposes. AFP, UPI and IANS news wire stories are copyright Agence France-Presse, United Press International and Indo-Asia News Service. ESA news reports are copyright European Space Agency. All NASA sourced material is public domain. Additional copyrights may apply in whole or part to other bona fide parties. All articles labeled "by Staff Writers" include reports supplied to Space Media Network by industry news wires, PR agencies, corporate press officers and the like. Such articles are individually curated and edited by Space Media Network staff on the basis of the report's information value to our industry and professional readership. Advertising does not imply endorsement, agreement or approval of any opinions, statements or information provided by Space Media Network on any Web page published or hosted by Space Media Network. General Data Protection Regulation (GDPR) Statement Our advertisers use various cookies and the like to deliver the best ad banner available at one time. All network advertising suppliers have GDPR policies (Legitimate Interest) that conform with EU regulations for data collection. By using our websites you consent to cookie based advertising. If you do not agree with this then you must stop using the websites from May 25, 2018. Privacy Statement. Additional information can be found here at About Us.