Space Industry and Business News  
ATK Highlights Progress On Ares I Crew Launch Vehicle

Changes to increase performance and meet the new flight profile include an enhanced shape of the propellant grain in the forward section, and a larger nozzle throat diameter. The core tooling to be used to achieve the new propellant shape is in manufacturing, as are components for the new nozzle.
by Staff Writers
Minneapolis MN (SPX) Apr 03, 2007
Alliant Techsystems has reported significant progress in developing hardware and materials in support of NASA's new Ares I crew launch vehicle. The Ares I is designed to carry crews to the International Space Station, back to the moon, and on to Mars.

In December 2005, NASA selected ATK to be the prime contractor for design and development of the first-stage propulsion system for the Ares I. The first stage is a five-segment solid rocket booster derived from the four-segment Space Shuttle reusable solid rocket motors (RSRM) developed and produced by ATK.

"We have made tremendous progress over the past year, and the project is on track to conduct ground and flight tests scheduled to begin in 2009," said Ron Dittemore, President, ATK Launch Systems.

The company is primarily using existing RSRM hardware for the new stage, but has added some newly designed components to increase performance and meet a different flight profile. A number of these components are undergoing dimensional checks and verification at ATK's facilities in Utah.

The parts currently being processed are destined for two full-scale engineering process simulation articles which will be shipped to NASA's Marshall Space Flight Center, Ala. in March 2008 to undergo loads testing and analysis of the motor.

Changes to increase performance and meet the new flight profile include an enhanced shape of the propellant grain in the forward section, and a larger nozzle throat diameter. The core tooling to be used to achieve the new propellant shape is in manufacturing, as are components for the new nozzle.

In addition, two mockups of the forward skirt, a section located at the top of the motor between the first and second stages, have also been constructed. The forward skirt is a structural housing for all the first stage electronics. The mockups will simulate the physical space available for the avionics and will be used to determine the optimal required space and placement of the electronics.

Related Links
ATK
Rocket Science News at Space-Travel.Com
Rocket Science News at Space-Travel.Com



Memory Foam Mattress Review
Newsletters :: SpaceDaily :: SpaceWar :: TerraDaily :: Energy Daily
XML Feeds :: Space News :: Earth News :: War News :: Solar Energy News


Anomalous Behaviour Affects Firing Test Of Vega Zefiro 9 Motor
Paris, France (ESA) Mar 30, 2007
On Wednesday 28 March, at around 15:00, the second firing test of the solid rocket motor 'Zefiro 9' - the motor that will power the third stage of ESA's future small launcher Vega - took place at the Salto Di Quirra Inter-force Test Range in Sardinia, Italy.







  • All Of Russia Will Have Internet And Phone Access
  • Wildblue High-Speed Internet Via Satellite Triples Capacity With New Satellite
  • Publish, Perish Attitudes Make Profs Balk At Online Publication
  • World Getting Ready To Change The Light Bulb

  • Two New Payloads For Ariane 5
  • Proton-M Carrier With Canadian Satellite To Be Launched April 10
  • South Korea Plans To Launch First Rocket In 2008
  • ISRO To Launch Foreign Satellite As Primary Payload First Time

  • NASA Seeks New Research Proposals
  • Germans Urged To Give Foreign Travel A Rest To Curb Global Warming
  • Raytheon Team Proposes Single International Standard In ADS-B Pursuit
  • NASA Signs Defense Department Agreement

  • Raytheon to Pursue US Air Force Network and Space Operations And Maintenance Contract
  • Boeing Helps US Air Force FAB-T Program Win Key Acquisition Award
  • Raytheon Completes Testing Of Navy Multiband Terminal Satellite Communications System
  • Northrop Grumman Adds Boeing To Its Integrated Air And Missile Defense Battle Command System Team

  • Long-Lasting Paper Documents
  • New Homes Rise From Rubbish
  • ESA Open-Source Software Supports TerraSAR-X
  • New KVH TracVision M5 And M7 Deliver Stronger Signals For Superior Onboard Satellite TV

  • William Shernit Joins Intelsat General As President and CEO
  • Northrop Grumman Appoints Catherine Kuenzel And Jill Kale IT Sector Vice Presidents
  • SMA Wins Space Adventures Account
  • Fifth Annual Space Career Fair Set For April 12

  • ESA Signs Arrangement With New Zealand On Tracking Station
  • DMCii To Launch New Higher-Resolution Satellite Imaging Service
  • First Greenhouse Gas Animations Produced Using Envisat SCIAMACHY Data
  • Take A Closer Look At Our Planet At The Palais De La Decouverte In Paris

  • Glonass System To Be Launched By Year-End
  • Haicom Is Proudly Announce The New HI-601VT GPS GSM Real-Time Tracker
  • Comtech To Supply Movement Tracking Systems To US Army
  • Russia Allocates $380 Million For Glonass In 2007

  • The content herein, unless otherwise known to be public domain, are Copyright Space.TV Corporation. AFP and UPI Wire Stories are copyright Agence France-Presse and United Press International. ESA Portal Reports are copyright European Space Agency. All NASA sourced material is public domain. Additional copyrights may apply in whole or part to other bona fide parties. Advertising does not imply endorsement, agreement or approval of any opinions, statements or information provided by Space.TV Corp on any Web page published or hosted by Space.TV Corp. Privacy Statement