SPACE MART SPACE DAILY SPACE WAR TERRA DAILY MARS DAILY SPACE TRAVEL GPS DAILY ENERGY DAILY
  Space Industry and Business News  
Get Our Free Newsletters Via Email
  
Search All Our Sites at SpaceBank
Relativity Mission Achieves Two Major Milestones

Gravity Probe B on a modal stand in preparation for environmental testing at Lockheed Martin

Huntsville - Mar 4, 2002
The NASA Gravity Probe B (GP-B) Relativity Mission has successfully mated its science payload to its spacecraft and after successful systems testing, the GP-B space vehicle was shipped to Sunnyvale, Calif., on Feb. 9, 2002, to prepare for upcoming rigorous environmental tests.

"These milestones are a huge accomplishment for this dedicated team," said Gravity Probe B program manager Rex Geveden, of NASA's Marshall Space Flight Center in Huntsville, Ala.

"The Gravity Probe B team is working hard to complete preparation and testing of one of the most unique experiments ever attempted in the history of science."

Gravity Probe B, led by principal investigator Francis Everitt and program manager Sasha Buchman of Stanford University in Stanford, Calif., has been pushing the limits on many different technological fronts, including gyroscope technology, materials science, metrology, astrometry, and cryogenics.

Scheduled for launch in late 2002 and using highly advanced technology, GP-B is expected to be the most precise test to-date of two extraordinary predictions of Albert Einstein's Theory of General Relativity.

Using its space-bound gyroscopes in a drag-free polar orbit, GP-B will measure how space and time are warped by the presence of the Earth, and, more profoundly, how the Earth's rotation drags space-time around with it.

These effects have far-reaching implications for the nature of matter and the structure of the Universe and are considered among the most profound enigmas of physics.

The mission's science instrument and its components were developed, designed, built and integrated in Stanford University's Hansen Experimental Physics Laboratory.

The payload is made up of the science instrument inside a probe integrated into one of the largest flight dewars (thermally insulated containers) ever constructed. The dewar provides the extremely low temperature environment needed for proper operation of the experiment while in Earth orbit.

The team has spent the last eight months in payload testing, successfully verifying all subsystems and the integrated payload at Stanford University before transporting and then mating the payload to the Lockheed Martin spacecraft at the corporation's nearby facility in Palo Alto.

Systems testing was conducted there to begin preparations for the series of acoustic and thermal-vacuum tests in Sunnyvale that will qualify the GP-B space vehicle for its upcoming launch.

Development of the Gravity Probe B mission is the responsibility of Stanford University, with major sub-contractor Lockheed Martin Corporation. GP-B is managed for NASA by the Marshall Space Flight Center.

Community
Email This Article
Comment On This Article

Related Links
Stanford GP-B
NASA Marshall Space Flight Center
SpaceDaily
Search SpaceDaily
Subscribe To SpaceDaily Express
Space Technology News - Applications and Research


Industry Team Achieve New Communications Technology With AESA Radars
Baltimore MD (SPX) Jan 12, 2006
A team comprised of three leading US aerospace and defense contractors has demonstrated an innovative technological use of active electronically scanned array (AESA) radars for high-bandwidth communications.






Memory Foam Mattress Review

Newsletters :: SpaceDaily Express :: SpaceWar Express :: TerraDaily Express :: Energy Daily
XML Feeds :: Space News :: Earth News :: War News :: Solar Energy News
  • Physicists Gain Online Research Tool That Will Save Thousands Of Hours Yearly
  • An Internet And Network Connection At The Power Outlet
  • Astrophysics Goes Virtual In European Digital Universe
  • Internet Virtual Observatory Taking Shape

  • Boeing Satellite for NASA Scheduled to Launch
  • Atlas 3 Launches EchoStar 7
  • EchoStar VII Ready For Launch
  • Rockot Hopes To Make GRACE Launch A Breeze

  • Boeing Signs Technology Development Agreement With JAI For Work On Sonic Cruiser
  • Boeing Sonic Cruiser Completes First Wind Tunnel Tests



  • Relativity Mission Achieves Two Major Milestones
  • Rutgers Researcher Develop New UV Technology
  • New Superconducting Transformer Is Light And Compact
  • A Whole New Fashion Industry

  • Earth and Space Sciences Grads Finding Jobs Faster

  • Jason 1 Ready For Service, Releases First Data
  • Ariane 5 Ready To Launch Climate Monitoring Hub
  • NASA's Quikscat Spacecraft Turns Operational
  • Digitalglobe Begins Initial Commercial Delivery Of QuickBird Products

  • GPS, Other Military Systems Protected By FCC Decision
  • Combined GPS/SBAS Receiver & Antenna Is Precise
  • Automotive Telematics Industry Maturing Poised for Growth
  • Terrorism Attacks Accelerate Interest in GPS Applications, Says Allied Business Intelligence

  • The content herein, unless otherwise known to be public domain, are Copyright 1995-2006 - SpaceDaily.AFP and UPI Wire Stories are copyright Agence France-Presse and United Press International. ESA PortalReports are copyright European Space Agency. All NASA sourced material is public domain. Additionalcopyrights may apply in whole or part to other bona fide parties. Advertising does not imply endorsement,agreement or approval of any opinions, statements or information provided by SpaceDaily on any Web page published or hosted by SpaceDaily. Privacy Statement