SPACE MART SPACE DAILY SPACE WAR TERRA DAILY MARS DAILY SPACE TRAVEL GPS DAILY ENERGY DAILY
  Space Industry and Business News  
Get Our Free Newsletters Via Email
  
Search All Our Sites at SpaceBank
Complexity Delays Solar Sail Project

Cosmos 1

Pasadena - Oct 17, 2003
We have decided to delay the launch of Cosmos 1, our solar sail, from October 2003 until 2004. Despite a summer of generally good test results on hardware and software, the team is taking extra time to test as many operations as possible. The Cosmos 1 spacecraft has become much more complex than we originally planned, and the test program is proceeding slowly and methodically. We will not rush or take any risky shortcuts.

Over the summer all flight hardware was delivered to the Babakin Space Center, except for one part of the on-board radio system. A complete engineering model of the spacecraft was assembled with all elements in flight configuration. It was then tested in a thermal and vacuum environment to simulate conditions during flight.

The operations of the flight electronics were also tested. This included end-to-end system tests of data flowing from the sensors, through the computer, and to the ground station receiver hardware.

Such end-to-end testing is mandatory not only for nominal spacecraft operations -- computer, sensors, the attitude control, sail deployment, and control of the sail blades -- but for any unexpected situations that might occur. The spacecraft has been built with a great deal of redundancy and backup modes, both in individual components and overall operation, and thus is more complex than we first planned. This is why the team has decided to stretch out the testing program to the end of this year to run through as many operational sequences as possible.

As we reported earlier, the Volna rocket payload separation system has passed a crucial test. The engineering model of the solar sail was attached to the third stage and tested through all phases of launch. The final phase included dropping the spacecraft in a large vacuum chamber tower to simulate free-fall (zero-g) and the vacuum of space. The second and third stages separated as planned. This verified that the problems experienced on sub-orbital flights in 2001 and 2002 were now solved, and that the Volna would be approved for our launch.

The engineering model was returned from the rocket factory in Miass, Russia, to the NPO Lavochkin complex near Moscow for final tests with flight hardware. This hardware includes new solar sail blades manufactured for the flight. At the same time, the flight model was being assembled. Final assembly, however, will not occur until the electronics testing is complete.

We still have one crucial hardware problem to solve in the spacecraft radio system that will receive (telemetry) and send (commands) information. We have planned on a dual redundant system using two different frequencies -- one in the UHF band, and one in the S-band. The S-band system is not yet delivered, and the UHF system has passed only half of its tests. Work is being completed on both to insure we will have a reliable system and a backup for the mission.

In addition to the great result from the Volna tests in far-away Miass (east of the Urals in Russia), the highlight of our summer was a display of a full-scale solar sail blade in the heart of New York City. Cosmos Studios and The Planetary Society were invited to include the sail as part of the Centennial of Flight exhibit in Rockefeller Center, which drew over a million people. This particular sail blade, which has now been deployed and packed several times during the test program in Russia and for our exhibit in New York, will next be exhibited in Pasadena at Planetfest 2004, where we'll be celebrating the landing of the first Mars Exploration Rover.

The work remaining includes completion of the software tests, additional checks of the new components on the engineering model, and the final assembly and test of the flight unit. This will take at least to the end of the year. Neither Cosmos Studios, the project sponsor, nor The Planetary Society are under any pressure -- nor do we want to create any pressure -- to launch before the system is ready.

Our attempt to fly the first solar sail spacecraft is risky enough without introducing additional risk due to impatience. I am grateful to both the Russian team at Babakin and IKI for taking care and attention to details and to Cosmos Studios for their patience in waiting for project results and a return on their investment.

Community
Email This Article
Comment On This Article

Related Links
Cosmos 1 Home
The Planetary Society
Planetfest 2004
SpaceDaily
Search SpaceDaily
Subscribe To SpaceDaily Express
Space Technology News - Applications and Research


TeleRay Mobile Sat TV Antenna For Japan Auto Market
Las Vegas CA (SPX) Jan 5, 2006
RaySat has introduced TeleRay, the world's smallest satellite TV vehicle antenna, into the domestic Japanese automotive market.






Memory Foam Mattress Review

Newsletters :: SpaceDaily Express :: SpaceWar Express :: TerraDaily Express :: Energy Daily
XML Feeds :: Space News :: Earth News :: War News :: Solar Energy News
  • Satellite Broadband To Boost Rural Economies
  • EMS Technologies Announces New Inmarsat Antenna
  • Give Me Liberty - Give Me MotoSAT
  • SES Astra Signs News Pan Africa Broadband Satellite Deal

  • ILS To Launch Third HISPASAT Bird
  • ILS To Launch SES Americom Broadband Bird Next Year
  • Rocket Propellant Leak Occurs During Titan 4 Operation
  • Atlas V Launches Rainbow 1 Satellite

  • Wright Flyer Takes To The Sky In Las Vegas
  • Aurora Builds Low-speed Wind Tunnel
  • Yeager To Retire From Military Flying After October Airshow
  • Boeing Signs Technology Development Agreement With JAI For Work On Sonic Cruiser



  • Complexity Delays Solar Sail Project
  • Sandia Develops Ultra-High-Temp Ceramics That Can Withstand 2000 C
  • Dyson's Long Shot
  • Putting Liquids on "Pause"

  • Earth and Space Sciences Grads Finding Jobs Faster

  • NASA Mission Receives More "Timed"
  • Post-Earthquake Reconnaissance Benefits Identified
  • Ball Aerospace To Build DigitalGlobe's NIMA Bird
  • DigitalGlobe Awarded in Excess of $500 Million NextView Contract From NIMA

  • Raytheon To Design Miniature, Anti-Jam GPS Navigator Capability
  • Xybernaut Adds TeleType GPS to Mobile/Wearable Computers
  • Inertial Measurement Unit Opens New Market Opportunities for KVH
  • Trimble To Acquire 3D Laser Scanning Company MENSI

  • The content herein, unless otherwise known to be public domain, are Copyright 1995-2006 - SpaceDaily.AFP and UPI Wire Stories are copyright Agence France-Presse and United Press International. ESA PortalReports are copyright European Space Agency. All NASA sourced material is public domain. Additionalcopyrights may apply in whole or part to other bona fide parties. Advertising does not imply endorsement,agreement or approval of any opinions, statements or information provided by SpaceDaily on any Web page published or hosted by SpaceDaily. Privacy Statement